Our full EPP customization workflow includes 8 steps: requirement communication → drawing design → CNC sampling & confirmation → mold making → mass production → quality inspection → packing & shipment → after-sales service. The biggest lead-time gap comes from two different sampling forms.

First, CNC machined prototype, available in 36–72 hours. This sample is milled from solid EPP block without new molds. It is used for checking outline, fitting and assembly in early design stage.
✅ Suitable for early design review and fit test.
⚠️ Limitations: CNC samples cannot achieve textured surface, embedded inserts. The bead fusion is different from mass molded parts. It is only for structural verification, not the final reference for mass production. If drawings keep changing or multiple revisions are needed, the lead time will be extended.

Second, mold making and molded sampling, 7–25 days for tooling. The wide range is normal, determined by these factors:

Only after mold completion can we produce steam-molded samples, which match mass production in texture, bead bonding and insert structure. Once samples are approved, mass production normally takes 6–15 days, subject to order quantity, anti-static modification, lab tests and ISTA shipping test requirements. We also support custom ETPU products and MPPE high-performance flame-retardant foam.

We avoid vague promises such as “samples ready in a few days”. We clarify for customers: If you only need to check fitting, CNC prototype is the faster option. If you need real textured finish or embedded inserts, tooling is required, and we will inform the 7–25 days window honestly.
???? Quick reference: 36–72h = CNC prototype (structure check only, not mass-production standard) 7–25 days = Mold + molded sample (real texture & insert effect, same as bulk goods)
Fumei follows standardized workflow and updates progress transparently. Send your drawings for accurate sampling and tooling schedule evaluation.